Manufacturing Capabilities
-
2 sand mixers for large and medium sized
molds with a mixing rate of 1,000 pounds per batch.
-
2 manual molding lines for medium size
cope and drag interlocked dump box molding.
-
Core area for large cores.
-
Two 1,000 kg induction furnaces with
a melt capacity of 8,000 kg per shift per shift for gray and Ductile Iron
MELTING
The metal is prepared in a 1 ton
capacity high frequency induction furnace. The raw materials like mild
steel scrap, carburisers and Ferro Alloys are purchased from reputed companies.
The raw materials are tested by our own well equipped laboratory. The raw
materials have to meet the stringent norms laid down by the quality system.
A record of testing of incoming raw materials is maintained. The liquid
metal both for cast iron and ductile iron is tested for its chemical composition
in our lab before it is poured in the molds. The temperature of each heat
is monitored with the help of dip type Pyrometer. A mobile pyrometer is
used to check the temperature while pouring. During pouring of the metal
samples are taken at different stages and checked for nodularity. The acceptance
and rejection of the castings is as per the nodularity requirements of
the metal. Ductile Iron manhole covers are made of grade 500/7.
FETTLING & INSPECTION
After castings are poured, 3 samples
are taken and checked for their microstructure. If the nodularity &
matrix structure of these samples is as per the norms then batches of castings
are accepted or rejected if otherwise. They are thoroughly checked for
any visual defects (100%) and then allowed to be processed further. The
castings after fettling are once again checked for any defect.
PAINTING
Before painting, the casting is
shot-blasted with the help of a hanging-type shot-blasting machine. The
casting are either coated in black bitumen or any other primer specified
by the customer.
TESTING
The patterns are checked for all
the dimensions thereby ensuring the accuracy of castings. We get our castings
tested (on random basis) for load bearing capacities by reputed labs at
regular intervals.
Test Load - EN124 : 1994
|
Class
|
Test Load (kn)
|
Application
|
|
A15
|
15
|
|
|
B125
|
125
|
|
|
C250
|
250
|
|
|
D400
|
400
|
|
|
E600
|
600
|
|
|
F900
|
900
|
|
Click for
Casting Flow Chart
|